Saturation Diving Services for SBM Offshore – Tie-in of flexible lines and jumpers (2 x 6 flange connections at PLEM and Xtrees)
Rana Scope of Work
Phase I – at Drill Centre “Tortue II”
- sand bags supports installation at PLEM and XT sides for flexible flowlines and jumpers terminations;
- tie-in of 1-off 6” flexible jumper and 2-off 6” flexible flowlines;
- diver platform installation at first and second XT;
- monitoring of Electrical flying lead (EFL) installation (performed by WROV)
Phase II – at Drill Centre “Tortue III”
- sand bags supports installation at PLEM and XT for flexible flowlines and jumpers terminations;
- tie-in of 2-off 6” flexible flowlines and jumpers at PLEM and XT side;
- diver platform installation at first and second XT;
- diver platform removal;
- monitoring of Electrical flying lead (EFL) installation (performed by WROV)