Project

Underwater IRM of jackets and sealines - Italy

Client

Eni S.p.A.

Rana Scope of Work

  • Inspection, repair, maintenance of 15 platforms in the Adriatic Sea
  • 12” pipeline repair by Plidco clamp installation
  • Extra work on PLEM at PC1-Bis platform

 

Project Data

Location

various fields offshore Italy

Dates

10/05/2018 to 19/09/2018

Diving Techniques

  • Saturation diving
  • Surface-supplied air diving

Duration

4 months

Resources

Vessels

MPSV Mamta

Diving Systems

Rana Saturation Diving System AF1

Air Diving System

Personnel

Diving team: 34

Main equipment

  • NDT equipment (MPI, UT, CP, ACFM)
  • Hydraulic tools
  • HP water jetting
  • Subsea welding/cutting
  • Lifting and installation aids